lifting project for ikm subsea

lifting project for ikm subsea​

Launch and Recovery Analysis: ROV, SMIS, and IRT

  • Client: IKM Subsea
  • Objective: Ensure efficient launch and recovery of ROV, SMIS, and CIRT.
  • Scope:
  • Determine safe sea state thresholds for ROV, SMIS, and CIRT deployment.
  • Define environmental limits for operational safety.
  • Evaluate configurations for SMIS and IRT, with and without mud mat.
  • Methodology: Performed both simplified formula calculations in accordance with DNV rules and time domain analyses for deployments through the moonpool and from the starboard side.
  • Summary: Our technical studies and analyses for AkerBP and IKM Subsea demonstrate our commitment to delivering engineering excellence. We define operational limits, evaluate arrangements, and utilize industry-standard analysis methods to ensure safety, efficiency, and feasibility in our marine operations.
lifting_2
lifting_1
lifting_3
lifting_4